If you’re planning a bathroom remodel, you’re probably wondering: “How long will it take?” While every project is unique, understanding the typical renovation timeline can help you plan ahead — and avoid surprises.
Here’s a breakdown of what to expect during a standard bathroom renovation in Pittsburgh.
A full bathroom remodel typically takes 2 to 6 weeks from demolition to final inspection. The timeline depends on:
Project complexity
Permits
Material lead times
Contractor availability
Unforeseen issues (like plumbing or mold)
Week 1: Demolition & Rough Work
Tear-out of old fixtures, tile, flooring
Plumbing & electrical rough-ins
Framing adjustments if needed
Week 2–3: Inspections & Structural Work
Rough-in inspections (if required)
Any structural repairs
Subflooring and moisture barriers
Week 3–4: Tile, Shower, Drywall, Paint
Tile installation (floors, walls, shower)
New drywall and waterproofing
First coats of paint and prep work
Week 5–6: Fixtures & Finishing Touches
Vanity, toilet, lighting, mirrors
Glass shower doors, trim, accessories
Final inspection and cleanup
Even well-planned bathroom remodels can run into small delays. These often include:
Special-order materials like vanities, glass, or tile
Plumbing or mold surprises behind walls
Permit wait times depending on your township
Working with a local contractor who understands Pittsburgh’s codes and permit process helps prevent delays.
Finalize design and materials before starting
Ask for a written project timeline
Communicate weekly with your contractor
Choose local suppliers for faster delivery
At Storm Construction & Remodeling, we help you build smart by providing a realistic timeline and keeping your project on schedule.
We remodel bathrooms of all sizes across Pittsburgh, Cranberry, Wexford, and surrounding areas.
Get started today — call (704) 496‑0030 or Email: info@stormcr.com.